摘要
鉴于青藏线西格二线关角隧道的特殊性,通过对国内已开通可借鉴的长大隧道京广线大瑶山隧道、兰武二线乌鞘岭隧道及青藏铁路既有关角隧道情况进行调研、测试、分析,综合新关角隧道环境条件、方案可靠性、维修维护、投资等各方面因素,推荐区间采用ZPW-2000系列无绝缘轨道电路,隧道内进行轨道电路分割方案。
In view of the special nature of Guanjiao tunnel on Qinghai-Tibet Xining-Ge'ermu second-line and on the basis of the investigation, test and analysis of the existing long tunnels on some domestic railway lines, this paper recommends ZPW-2000 non-insulation track circuit in the section between stations and track circuit segmentation in the tunnel with respect to environmental conditions of the tunnel, reliability of plan, maintenance and investment..
出处
《铁道标准设计》
北大核心
2015年第4期111-116,共6页
Railway Standard Design
关键词
关角隧道
道床电阻
轨道电路
分割
Guanjiao tunnel
Ballast bed resistor
Track circuit
Segmentation