摘要
介绍了高坝洲升船机排水泵控制系统的设计及具体实施内容,以现地CPU为核心组成数据采集、逻辑控制、现地和远程监控的控制系统,进行了设备升级,提高了设备自动化程度和可靠性。
The design and realization details of the drainage pump control system for shiplifl in Gaobazhou Hydropower Station is introduced. The control system includes the data acquisition, logical control, local and remote monitoring modules, in which the local CPU is the core element. With the upgrading, the degree of automation and also the relia- bility of the control devices are improved.
出处
《水电与新能源》
2015年第3期43-45,共3页
Hydropower and New Energy