期刊文献+

Reliability Analysis on Repairable System with Dual Input Closed-Loop Feedback Link Considering Shutdown Correlation Based on Goal Oriented Methodology 被引量:3

Reliability Analysis on Repairable System with Dual Input Closed-Loop Feedback Link Considering Shutdown Correlation Based on Goal Oriented Methodology
下载PDF
导出
摘要 Goal oriented( GO) methodology is a kind of success oriented system reliability analysis method and has been used widely.The repairable system with dual input closed-loop feedback link( DICLFL) considering shutdown correlation didn't make reliability analysis accurately based on existing GO methodology. So, a reliability analysis method used to deal with DICLFL considering shutdown correlation is provided based on GO methodology.Firstly, a new operator, which is used to describe DICLFL considering shutdown correlation,whose number is 1,is created and named as Type 9C operator. And then,the formulas of type 9C operator are derived based on Markov process theory. Finally,the new method presented in this paper is adopted to conduct the reliability analysis of an electro-hydraulic servo speed control system. The analysis result is compared with those of Monte Carlo simulation and fault tree analysis( FTA). The comparison results show that this new reliability analysis method based on GO methodology is feasible and meaningful for reliability analysis of repairable systems with DICLFL considering shutdown correlation.Meantime,it will be useful for more other applications. Goal oriented( GO) methodology is a kind of success oriented system reliability analysis method and has been used widely.The repairable system with dual input closed-loop feedback link( DICLFL) considering shutdown correlation didn't make reliability analysis accurately based on existing GO methodology. So, a reliability analysis method used to deal with DICLFL considering shutdown correlation is provided based on GO methodology.Firstly, a new operator, which is used to describe DICLFL considering shutdown correlation,whose number is 1,is created and named as Type 9C operator. And then,the formulas of type 9C operator are derived based on Markov process theory. Finally,the new method presented in this paper is adopted to conduct the reliability analysis of an electro-hydraulic servo speed control system. The analysis result is compared with those of Monte Carlo simulation and fault tree analysis( FTA). The comparison results show that this new reliability analysis method based on GO methodology is feasible and meaningful for reliability analysis of repairable systems with DICLFL considering shutdown correlation.Meantime,it will be useful for more other applications.
出处 《Journal of Donghua University(English Edition)》 EI CAS 2016年第2期314-318,共5页 东华大学学报(英文版)
基金 Technical Basis Projects of China's MIIT(Nos.ZQ092012B003,2012090003)
关键词 shutdown correlation goal oriented(GO) methodology GO operator dual input closed-loop feedback link(DICLFL) reliability analysis shutdown correlation goal oriented(GO) methodology GO operator dual input closed-loop feedback link(DICLFL) reliability analysis
  • 相关文献

参考文献17

  • 1Williams R L,Gate W Y.Use of the GO Methodology to Directly Generate M inimal Cut Sets[C].Society for Industrial and Applied M athematics,Pennsylvania,USA,1977:825-849.
  • 2Chu B B.GO Methodology:Overview Manual,EPRI NP-3123,vol.1[R].WA,USA:Electric Pow er Research Institute,1983.
  • 3Chu B B.GO Methodology:Application and Comparison of the GO methodology and Fault Tree Analysis,EPRI NP-3123,vol.2[R].WA,USA:Electric Power Research Institute,1983.
  • 4Chu B B.GO Methodology:GO Modeling Manual,EPRI NP-3123,vol.3[R].WA,USA:Electric Pow er Research Institute,1983.
  • 5Chu B B.GO Methodology:GO User's Manual,EPRI NP-3123,vol.4[R].WA,USA:Electric Pow er Research Institute,1983.
  • 6Chu B B.GO Methodology:Program and User's Manual(IBM Version),EPRI NP-3123,vol.5[R].WA,USA:Electric Pow er Research Institute,1983.
  • 7Chu B B.GO Methodology:Program and User's Manual(CDC Version),EPRI NP-3123,vol.6[R].WA,USA:Electric Pow er Research Institute,1983.
  • 8Wood D E,Becar N J.Risk Analysis of a Spent Fuel Received and Storage Facility Using the GO methodology,KSC-1006-1[R].California,USA:Kaman Sciences Corporation,1979.
  • 9Yi X J,Dong H P,Wang Q F,et al.A New System Reliability Analysis Method:the Current Development of GO Methodology in China[J].WIT Transactions on Engineering Sciences,2014,108:222-229.
  • 10Shen Z P,Wang Y,Huang X R.A Quantification Algorithm for a Repairable System in the GO Methodology[J].Reliability Engineering and System Safety,2003,80(3):293-298.

二级参考文献3

共引文献2

同被引文献15

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部