期刊文献+

综合地质预报技术在都良隧道动态设计中的应用 被引量:2

Application of Comprehensive Geological Prediction Technology to Observational Design for the Duliang Tunnel
下载PDF
导出
摘要 都良隧道地质条件复杂,施工风险高。为避免不良地质灾害的发生,确保施工安全,在施工期间选择了"以地质法为基础,中长距离与短距离物探技术相结合,辅以超前水平钻"的综合地质预报技术。通过对高风险段的综合预报,准确预报了不良地质体的性质和分布情况,为隧道施工方案制定和设计参数动态调整提供了可靠的依据,保障了施工安全,对同类隧道施工具有借鉴意义。 Because of the complex geological conditions and high construction risk present in the Duliang tunnelproject, comprehensive geological prediction technology(i.e., basic geological method+medium-and-long distanceand short distance detection techniques combined with the geophysical prospecting method+the advanced horizontaldrill probing method) has been adopted to prevent the occurrence of geological disasters and ensure safety duringthe construction period. This comprehensive prediction for high risk sections accurately determines the nature anddistribution status of unfavorable geologic bodies, provides a reliable basis for deciding upon a tunnel constructionscheme and adjusting design parameters, and guarantees construction safety.
出处 《现代隧道技术》 EI CSCD 北大核心 2016年第3期151-156,共6页 Modern Tunnelling Technology
关键词 隧道 地质预报 HSP声波反射法 探地雷达 Tunnel Geological prediction HSP acoustic reflection method Ground penetrating radar
  • 相关文献

参考文献14

  • 1静天文,江玉生,李晓.公路隧道围岩分类与支护优化设计[M].北京:人民交通出版社,2006.
  • 2JING Tianwen, JIANG Yusheng, LI Xiao. Surrounding Rock Classification and Support Optimization Design in Highway Tunnelling [M]. Beijing: China Communication Press, 2006.
  • 3丛会涛.隧道动态设计方法与实用技术研究[D】.北京:铁道科学研究院,硕士论文,2004.
  • 4CONG Huitao. Research of Observational Design Method and Practical Technique in Tunnellling[D]. Beijing: China Academy of Railway Science, Master Thesis, 2004.
  • 5何发亮 李苍松.物探方法在隧道施工期地质超前预报中的应用[C]..《中国工程地球物理检测技术》论文集[C].,2001年.145-149.
  • 6HE Faliang, LI Cangsong. Application of Geophysical Prospecting Method in Geological Prediction during Tunnel Construction Peri- od[C]//Professional Committee of Engineering Geophysics of Chinese Geophysical Society. Proceedings of Geophysical Detection Techniques for Chinese Engineering. 2001 : 145-149.
  • 7李苍松.长大岩溶隧道施工地质预报方法综述[C]..2003年《中国土建工程学术暨建设成果》论文集(下册)[C].成都:四川科学技术出版社,2003—07.612-617.
  • 8LI Cangsong. Overview of Geological Forecast Method for the Construction of Long Karst Tunnel [C] // Proceedings of China's Traf- fic and Civil Engineering and Construction Achievement. Chengdu: Sichuan Science and Technology Press, 2003.
  • 9来弘鹏,遆甲峰,张宏光,谢永利.浅埋大断面土质隧道下穿明长城施工安全控制技术研究[J].现代隧道技术,2015,52(1):190-196. 被引量:13
  • 10LIAO YanKai, DAI JianLing, WU Zhi, et al. Application of Advance Geologic Prediction to the Observational Construction of Rail- way Tunnels[J]. Modem Tunnelling Technology, 2105, 52 (1): 197-202.

二级参考文献12

共引文献103

同被引文献16

引证文献2

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部