摘要
基于山西武乡西山发电有限责任公司新建2×600 MW直接空冷机组的情况,叙述了武乡2×600 MW机组辅助汽源存在的问题,研究了双机停运、无启动锅炉启动方案的提出及制定,并分析了其实际效果。
Based on the situation of new 2×600 MW direct air-cooling unit used in Wuxiang Xishan Power Generation Co., Ltd. of Shanxi, described the problems existing in the auxiliary steam source of Wuxiang 2×600 MW unit, studied propose and formulation of start-up plan without start-up boiler and double machine shut down, and analyzed its practical effect.
出处
《能源与节能》
2017年第4期18-19,190,共3页
Energy and Energy Conservation
关键词
直接空冷机组
无启动锅炉
无外部辅助汽源
启动
direct air cooling unit
without start-up boiler
without external auxiliary steam source
start-up