公私合作(PPP)项目提前终止致因模型研究 被引量:12

A Study on the Causing Factors for Early-Termination of PPP Projects
下载PDF
导出
摘要 本文在识别PPP项目提前终止影响因素的基础上,把影响因素划分为基本影响因子和阶段表现因子,建立了基本影响因子通过阶段表现因子综合作用导致PPP项目提前终止的结构方程模型,并对其进行了实证检验。研究结果表明,"组织"和"制度"风险因素对关系终止的影响作用最大,"市场"和"环境"风险因素对实体终止的影响作用最大,"建设风险"发生实体终止的系数要高于"运营风险",而"运营风险"发生关系终止的系数要高于"建设风险"。虽然关系终止发生的频率要高于实体终止发生的频率,但是实体终止导致项目损失的程度要大于关系终止导致的损失程度。 This article studies the critical factors for early-termination of PPP projects and analyzes the causal relationship among them. It first identifies the influencing factors causing early-termination of PPP projects( Abbreviated to"PET"),and then divide them into the basic factors and the stage-performance factors. It names the basic factors as the premise variables,the stage-performance factors as the intermediate variables,and nominates the two factors of relationship-termination and entity-termination as the consequence variables. It establishes a structural equation model,in which the premise variables generate the consequence variables via affecting the intermediate variables. Questionnaire is used for data collecting in this empirical study. SEM method is applied to test and modify the model. By calculating the effect of each variable,this research gains the following results: The " organization" risk factors and the " system" risk factors have the greatest impact on the relationshiptermination,while the " Market" risk factors and the " environment" risk factors have the greatest impact on the entity-abandonment. Compared to the " operation phase",entity-abandonment is more likely to occur during the " construction phase" while relationship-termination is more likely to happen during the " operation phase". As the relationship-termination does not usually lead to delivery—while entity-abandonment usually does,it is important to realize that the dimensions of project failure caused by entity-abandonment are even more critical than those caused by relationship-termination.
出处 《财经论丛》 CSSCI 北大核心 2017年第7期104-112,共9页 Collected Essays on Finance and Economics
基金 国家自然科学基金项目(71171017)
关键词 公私合作项目 提前终止 致因因素 结构方程模型 Public-Private Partnership(PPP) Early-Termination Causing Factors Structural Equation Model
  • 相关文献

参考文献9

二级参考文献81

  • 1张维然,林慧军,王绥娟.延安东路隧道复线BOT模式之评价[J].中国市政工程,1996(3):48-53. 被引量:2
  • 2钱维,龚向虎.公共基础设施特许经营合约与风险治理研究—以南京长江隧道工程为例[J].中国工程科学,2007,9(3):62-66. 被引量:1
  • 3Wang S Q. Lessons learnt from the PPP practices in China ( keynote speech) [ A ]. Asian Infrastructure Congress 2006 [ C]. Organized by Terrapinn and sponsored by IAPF, Hong Kong, Nov 29- 30, 2006.
  • 4中华环保频道.长春汇津污水处理有限公司诉长春市人民政府案一审结案[OL].http://www.cctvep.eom/news/news1721.htm,2008-8-20.
  • 5亚洲开发银行.中国城市水业市场化(PPP)推进过程中遇到的一些重要问题及相关建议[R].亚洲开发银行技术援助项目-4095:中华人民共和国/政策调整.2005,1.
  • 6沈际勇 王守清 强茂山.中国BOT/PPP项目的政治风险和主权风险:案例分析.华商?投资与融资,2005,1:1-7.
  • 7浙商网.谁动了杭州湾跨海大桥的奶酪?[OL].http://www.zjol.com.cn/gb/node2/nodel38665/node257861/node257865/node257874/userob-ject15ai3951216.html,2005-3-2.
  • 8中金在线.投资商数亿投资血本无归[OL].http://news.stock888.net/040804/101,1317,1009454,00.shtml,2004-8-4.
  • 9新华网.盲目承诺出恶果:港商索赔9亿元[OL].ht-tp://news.xinhuanet.eom/comments/2004-08/04/content_1708128.htm,2004-8-4.
  • 10赵燕凌.中华发电命系电力改革,竞价上网危及当年BOT承诺[OL].搜狐,转自:财经时报,http://it.sohu.com/34/12/article209271234.shtml,2003-5-15.

共引文献548

同被引文献118

引证文献12

二级引证文献74

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部