摘要 浅埋软弱围岩隧道一般采取CD法、CRD法和侧壁导坑法进洞,这些常规进洞方法需设置或拆除大量临时支撑,在一定程度上影响了整座隧道的工程进度。文章以某高速公路隧道为依托,建立了在超前大管棚和小导管联合预支护条件下采用CD法、CRD法、双侧壁导坑法和三台阶七步法进洞的三维数值计算模型,对比分析了不同开挖方法控制围岩变形和支护受力的优劣,提出了"地表注浆+扩大拱脚+拱架Z型连接+拱脚槽钢纵梁"稳定性控制措施下的三台阶七步法快速进洞方案。数值计算和现场实测结果表明:该进洞方案更有利于发挥支护结构的棚架效应,可有效控制地层变位,减小支护应力,在保障安全进洞的同时,加快了施工的进度,可为类似工程提供参考和借鉴。 The excavation methods of CD, CRD and side heading are adopted to construct a shallow-buried tunnel portal in a weak rock mass with uneven rock pressure; a large number of temporary supports need to be set or re- moved, so the whole project schedule of the tunnel is affected. Based on a highway tunnel, the advantages and disad- vantages of rock mass deformation control and force on the support by different excavation methods (CD, CRD, side heading and three-bench-seven-step) were compared through a 3D numerical analysis with the condition of a com- bined support of a large advance pipe roof and small conduits. A fast three-bench and seven-step excavation scheme was proposed based on the factors of surface grouting, an expanding arch spring, a steel arch with a Z-type connection and longitudinal stability control at the arch spring. The numerical calculation and field measurements show that the pipe-roof effect of the steel arch support will be in full swing with this proposed entrance scheme, while strata displacement can be well controlled, support stress is reduced, and the construction progress goes faster.
作者 王道远 袁金秀 王记平 程园 王凯 夏勇 王海蛟 WANG Daoyuan;YUAN Jinxiu;WAGN Jiping;CHENG Yuan;WANG Kai;XIA Yong;WANG Haijiao(Department of Civil Engineering,Hebei Jiaotong Vocational and Technical College,Shijiazhuang 050091;School of Civil Engineering,Shijiazhuang Tiedao University,Shijiazhuang 050043;Hebei Provincial Expressway Shi-An Management Department,Shijiazhuang 050000;CSCEC Road and Bridge Group Co.Ltd.,Shijiazhuang 050001)
出处 《现代隧道技术》 EI CSCD 北大核心 2018年第4期178-185,共8页 Modern Tunnelling Technology
基金 国家自然科学基金(51478277) 河北省自然科学基金(E201619002) 河北省人才工程培养经费资助科研项目(A201500116) 河北省重点研发计划项目(172776471) 河北省高等学校科学技术研究青年基金(QN2016240)
关键词 浅埋 软弱围岩 隧道 扩大拱脚 拱架Z型连接 纵梁加固 快速进洞 稳定性控制 Shallow overburden Soft rock mass Tunnel Expanding arch spring Steel arch with Z-type connection Longitudinal beam strengthening Fast entrance excavation Stability control