期刊文献+

模糊偏好的TBM刀盘溜碴结构设计 被引量:4

Optimization method for structural design of mucking plate
下载PDF
导出
摘要 溜碴板作为刀盘的支撑结构,会影响刀盘的出碴性能,也会影响刀盘的刚度与强度.依据以往传统设计方法得到溜碴板出现的问题,在满足刀盘刚度和强度设计要求的条件下,提出了一种通过修改溜碴板有效长度来改进出碴性能的方法,并对有效长度不同的溜碴板所对应的TBM整体刀盘用离散元法仿真模拟其出碴过程.结合模糊综合评价模型对仿真结果进行分析对比,证实刀盘的出碴性能会受到溜碴板有效长度的影响. As the supporting structure of the cutterhead,the mucking plate plays a role in the mucking performance of the cutterhead,followed by the stiffness and strength of the cutterhead.According to the problem of the mucking plate in traditional design process,on the premise of not reducing the strength and stiffness of cuterhead,a method reducing the effective length of mucking plate to improve the mucking performance of the cutterhead was proposed.And the mucking process of TBM cutterheads provided with different effective length mucking plate was simulated by discrete element method simulation.Through the results of discret element mothod simulation,the mucking performance was evaluated by using the fuzzy comprehensive evaluation method.It has proved that the effective length of mucking plate has great influence on the mucking performance of the cutterhead.
作者 聂晓东 胡军 聂诗武 李旋旋 霍军周 陈巍 NIE Xiaodong;HU Jun;NIE Shiwu;LI Xuanxuan;HUO Junzhou;CHEN Wei(Material and Equipment Management Office,Xinjiang Irtysh River Basin Development and Construction Administrative Bureau,Urumqi 830000,China;School of Mechanical Engineering, Dalian University of Technology,Dalian 116024,Liaoning,China)
出处 《中国工程机械学报》 北大核心 2018年第5期421-426,共6页 Chinese Journal of Construction Machinery
基金 国家自然科学基金重点资助项目(U1708255)
关键词 溜碴板 离散元法仿真 模糊综合评价 mucking plate discret element mothod simulation fuzzy comprehensive evaluation
  • 相关文献

参考文献4

二级参考文献20

  • 1J. Huo et al. Disc cutters plane layout design of the full- face rock tunnel boring machine (TBM) based on different layout patterns [J]. Computers & Industrial Engineering 61 (2011), 1209-1225.
  • 2Balling R J, Sobieszczanski S J. Optimization of coupled systems[J]. AIAA Journal, 1996,34(1) :6-17.
  • 3Zhao J, Gong Q M, Eisensten Z. Tunneling through a frequency changing and mixed ground[J]. Tunneling and Underground Space Technology, 2007,22:388-400.
  • 4Potter M A, De Jong K A. A cooperative coevolutionary approach to function optimization[G]// Proceedings of the Third Conference on Parallel Problem Solving from Nature. Jerusalem: [s. n.], 1994 : 249-257.
  • 5刘启山.岩石隧道掘进机(TBM)施工及工程实例[M].北京:中国铁道出版社,2004.
  • 6BALLING R J, SOBIESZCZANSKI S J. Optimization of coupled systems [ J]. AIAA Journal, 1996,34 ( 1 ) : 6- 17.
  • 7ZHAO J, GONG Q M, EISENSTEN Z. Tunneling through a frequency changing and mixed ground [ J ]. Tunneling and Underground Space Technology, 2007, 22 : 388-400.
  • 8POTTER M A, De JONG K A.A cooperative coevolu- tionary approach to function optimization [ C ]/! Pro- ceedings of the Third Conference on Parallel Problem Solving from Nature. Jerusalem, 1994:249-257.
  • 9PAREDIS J. Steps towards co-evolutionary classification neural networks[ C ]//The Proceedings of the Fourth In- ternational Workshop on the Synthesis and Simulation of Living Systems. Cambridge, USA, 1994 : 102-108.
  • 10PAREDIS J. Co-evolutionary constraint satisfaction [ C ]// The Proceedings of the Third Conference on Parallel Problem Solving from Nature 2. Berlin, 1994 : 46-55.

共引文献43

同被引文献49

引证文献4

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部