期刊文献+

Height prediction of water flowing fractured zones based on BP artificial neural network

Height prediction of water flowing fractured zones based on BP artificial neural network
下载PDF
导出
摘要 Factures caused by deformation and destruction of bedrocks over coal seams can easily lead to water flooding(inrush)in mines,a threat to safety production.Fractures with high hydraulic conductivity are good watercourses as well as passages for inrush in mines and tunnels.An accurate height prediction of water flowing fractured zones is a key issue in today's mine water prevention and control.The theory of leveraging BP artificial neural network in height prediction of water flowing fractured zones is analysed and applied in Qianjiaying Mine as an example in this paper.Per the comparison with traditional calculation results,the BP artificial neural network better reflects the geological conditions of the research mine areas and produces more objective,accurate and reasonable results,which can be applied to predict the height of water flowing fractured zones. Factures caused by deformation and destruction of bedrocks over coal seams can easily lead to water flooding(inrush) in mines, a threat to safety production. Fractures with high hydraulic conductivity are good watercourses as well as passages for inrush in mines and tunnels. An accurate height prediction of water flowing fractured zones is a key issue in today’s mine water prevention and control. The theory of leveraging BP artificial neural network in height prediction of water flowing fractured zones is analysed and applied in Qianjiaying Mine as an example in this paper. Per the comparison with traditional calculation results, the BP artificial neural network better reflects the geological conditions of the research mine areas and produces more objective, accurate and reasonable results, which can be applied to predict the height of water flowing fractured zones.
出处 《Journal of Groundwater Science and Engineering》 2019年第4期354-359,共6页 地下水科学与工程(英文版)
基金 funded by Royalty and Price of the Mining Right of the Ministry of Finance and the Ministry of Land and Resources in 2012 ([2012]145)
关键词 HEIGHT of water flowing fractured ZONE BP artificial NEUTRAL network COMPARATIVE analysis Height of water flowing fractured zone BP artificial neutral network Comparative analysis
  • 相关文献

参考文献9

二级参考文献78

共引文献578

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部