摘要
文章根据实验情况介绍、工况及对应丁坝工作性征计算结果,对非淹没组合丁坝局部冲蚀规律进行实验分析。把握组合丁坝局部冲蚀规律,对组合丁坝设计和安全管理有重要参考和应用价值。文章依托渭河中段某非淹没组合丁坝护岸工程实用资料,以实验室比尺模型实验的方式,对非淹没组合丁坝局部冲蚀规律开展专题实验研究,分析组合丁坝工作特性,探讨其冲刷流性征,以为同类工程应用提供研究和技术参考。
Based on the experimental introduction,engineering condition and corresponding calculation results of groin work characters,this paper analyzes the experiment about partial erosion law of non-inundation compound groyne.It is great reference and application value for the design and safety management of composite groin to grasp the local erosion law of composite groin.According to the practical data about a non-inundation composite groin bank-protection project located in middle section of the Wei river,this paper carries out a special experimental study on the local erosion law of the non-submerged combined spur dike by means of the scale model experiment in the laboratory,and analyzes the working characteristics of the combined spur dike,also discusses its scour flow characteristics,so as to provide research and technical reference for similar engineering applications.
作者
卢国伟
LU Guo-wei(Kangshan Dike Management Bureau,Yugan 335100,China)
出处
《黑龙江水利科技》
2019年第11期16-19,137,共5页
Heilongjiang Hydraulic Science and Technology
关键词
组合丁坝
非淹没
局部冲蚀
关联规律
模拟实验
分析研究
compound groyne
non-inundation
partial erosion
correlation law
simulation experiment
analysis and research