期刊文献+

Solving flexible job shop scheduling problem by a multi-swarm collaborative genetic algorithm 被引量:8

下载PDF
导出
摘要 The flexible job shop scheduling problem(FJSP),which is NP-hard,widely exists in many manufacturing industries.It is very hard to be solved.A multi-swarm collaborative genetic algorithm(MSCGA)based on the collaborative optimization algorithm is proposed for the FJSP.Multi-population structure is used to independently evolve two sub-problems of the FJSP in the MSCGA.Good operators are adopted and designed to ensure this algorithm to achieve a good performance.Some famous FJSP benchmarks are chosen to evaluate the effectiveness of the MSCGA.The adaptability and superiority of the proposed method are demonstrated by comparing with other reported algorithms.
出处 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2021年第2期261-271,共11页 系统工程与电子技术(英文版)
基金 supported by the National Key R&D Program of China(2018AAA0101700) the Program for HUST Academic Frontier Youth Team(2017QYTD04).
  • 相关文献

参考文献6

二级参考文献8

共引文献62

同被引文献73

引证文献8

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部