Determining the Planning Period of a Distribution Substation Based on Acceptable Errors

原文传递
导出
摘要 The distribution substation planning is faced with numerous uncertainties so that the planning result can only be a“rough outline,”and the problem of determining the planning period arises.On the basis of the assessment of uncertainties in distribution planning,a specific approach to determine the planning period of a distribution substation based on acceptable errors is proposed,indicating that the load forecast error is the key factor to affect the planning period.In order to provide a clearer understanding of this paper’s primary objective,the proposed approach is applied to determining the planning period of a power supply radius optimization(PSRO)model in distribution substation planning.Finally,an example is illustrated which validates the suggested approach of this paper.
出处 《CSEE Journal of Power and Energy Systems》 SCIE 2017年第3期296-301,共6页 中国电机工程学会电力与能源系统学报(英文)
基金 supported by National Natural Science Foundation of China under Grant 51777121.
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部