摘要 乐清市清江污水处理厂一期工程处理规模为0.35×10^(4)m^(3)/d,因工业废水、生活污水的排放量增加,扩建工程设计处理规模为0.55×10^(4)m^(3)/d,总处理规模为0.9×10^(4)m^(3)/d。污水主体工艺为AAO工艺,2020年7月~2021年9月连续15个月的运行数据表明,系统出水COD、NH_(3)-N、TN、TP平均值分别为11.85、0.25、7.31、0.12 mg/L,平均去除率分别为91.34%、98.88%、73.26%、94.83%,出水各指标均达到甚至优于《城镇污水处理厂污染物排放标准》(GB 18918-2002)一级A标准。复合碳源与葡萄糖相比,脱氮消耗、污泥处置的吨水费用显著降低,复合碳源是较佳的外加碳源。 The treatment capacity of the frist-stage project of wastewater treatment plant in Qingjiang was 0.35×10^(4)m^(3)/d.Due to increased discharge of industrial wastewater and domestic sewage,the design treatment capacity of the expansion project was 0.55×10^(4)m^(3)/d.The total treatment capacity was0.9×10^(4)m^(3)/d.The AAO was the main process.The water quality of 15 consecutive months from July.2020 to September.2021 indicated that the average values of COD,NH_(3)-N,TN and TP are 11.85 mg/L,0.25 mg/L,7.31 mg/L,0.12 mg/L respectively and the average removal rates are 91.34%,98.88%,73.26%,94.83%respectively.All the indexes of effluent can meet and even surpass the first level A criteria specified in the Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant(GB 18918-2002).The complex carbon sourses was better than glucose because the treatment cost per ton wastewater of denitrification consumption and sludge disposal was significantly reduced.
作者 郑伟波 叶岳宇 陈成 胡如意 孙雅峰 郑卉 ZHENG Weibo;YE Yueyu;CHEN Cheng;HU Ruyi;SUN Yafeng;ZHENG Hui(Zhejiang Reach Green Environmental Technology Co.,Ltd,325024;Wenzhou Institute of Industry&Science,325000:Wenzhou,China)
出处 《水处理技术》 CAS CSCD 北大核心 2023年第1期137-142,共6页 Technology of Water Treatment
关键词 污水处理厂 工程实例 一级A标准 外加碳源 WWTP project example first level A criteria additional carbon source
  • 相关文献

参考文献10

二级参考文献100

共引文献92

同被引文献25

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部