摘要
以临沭县苍源河曹村一号闸除险加固工程为研究对象,基于多目标模糊层次分析法建立了包含生态环境和社会经济2个一级指标和21个次级指标的综合评价模型,对模型判断矩阵一致性进行检验后,计算了D层指标的总排序和总权重向量矩阵,再利用专家评价法计算各指标单因素隶属度,最终求得综合指标结果为B=0.882,说明此工程实施效果的后评价结果较好,工程建设是成功的。
Taking the No.1 sluice danger removal and reinforcement project of Cao Village,Cangyuan River,Linshu County as the research object,a comprehensive evaluation model including 2 first-level indicators of ecological environment and social economy and 21 second-level indicators was established based on multi-objective fuzzy AHP.After checking the consistency of model judgment matrix,the total ranking and total weight vector matrix of level D indexes are calculated,and then the single factor subordination degree of each index is calculated by expert evaluation method.The final comprehensive index result is B=0.882,which indicates that the post-evaluation result of the project implementation effect is better and the project construction is successful.
作者
鄢琼
YAN Qiong(Anhui Branch of Huai'an Water Conservancy Survey and Design Research Institute Co.,Ltd,Hefei 230601,China)
出处
《云南水力发电》
2023年第4期89-93,共5页
Yunnan Water Power
关键词
综合指标
综合治理工程
多目标模糊层次分析法
后评价
comprehensive index
comprehensive treatment project
multi-objective fuzzy ahp
post-evaluation