摘要
本文构建了某拱形重力坝三维全坝段-地基体系有限元分析模型,综合考虑了坝体横缝和坝基交界面接触非线性,采用基于拉格朗日乘子法的动接触力模型模拟接触非线性问题,采用黏弹性人工边界考虑无限地基辐射阻尼效应,分别开展横缝初始间隙0、2和20 mm下的重力坝-地基体系非线性有限元动力时程分析,揭示不同横缝初始间隙对大坝动力响应的影响,为工程抗震设计提供科学依据.
In this paper,a three-dimensional model of a curved-gravity dam foundation system is constructed,which comprehensively considers the contact nonlinearity of transverse joints and dam foundation interface.The dynamic contact force model based on the Lagrange multiplier method is used to simulate the contact nonlinearity,and the viscoelastic artificial boundary is used to consider the radiation damping effect of the infinite foundation.The nonlinear dynamic time history analyses of the gravity dam foundation system with initial gaps of transverse joints of 0 mm,2 mm and 20 mm are performed to reveal the influence of different initial gaps of transverse joints on the dynamic response of the dam,which provides a scientific basis for engineering seismic design.
作者
林易澍
梁辉
郭胜山
钟红
LIN Yishu;LIANG Hui;GUO Shengshan;ZHONG Hong(Beijing Engineering Corporation Limited of PowerChina,Beijing 100024,China;China Institute of Water Resources and Hydropower Research,Beijing 100048,China)
出处
《三峡大学学报(自然科学版)》
CAS
2023年第5期66-70,共5页
Journal of China Three Gorges University:Natural Sciences
基金
国家自然科学基金面上项目(51979292)。
关键词
拱形重力坝三维全坝段
动接触力模型
接触非线性
横缝初始间隙
动力时程分析
three-dimensional model of a curved-gravity dam foundation system
dynamic contact force model
contact nonlinearity
initial gaps of transverse joints
nonlinear finite element dynamic time history analysis