期刊文献+

盾构下穿石油管道变形控制措施研究 被引量:1

RESEARCH ON THE DEFORMATION CONTROL MEASURES FOR OIL PIPELINES UNDER SHIELD TUNNELING
下载PDF
导出
摘要 在地铁盾构隧道工程中,石油管线作为重大风险源,在盾构穿越过程中需要严格控制管线的沉降变形。文中结合地铁盾构隧道工程的特性,提出一系列的工程处理措施,并采用有限元软件对盾构下穿石油管线施工过程进行数值模拟分析,与实际沉降数据比对,结果表明文中提出的工程处理措施对于控制管线变形较为有效,同时为类似工程提供参考。 In a subway shield tunneling project,oil pipelines are a major risk source,therefore strict control of pipeline settlement and deformation is required during the shield tunneling process.Based on the characteristics of subway shield tunnel engineering,this article proposes a series of engineering treatment measures and uses finite element software to conduct numerical simulation analysis of the construction process of shield tunneling through oil pipelines.The results are compared with practical settlement data,indicating the proposed engineering treatment measures are effective in controlling pipeline deformation,providing the reference for similar projects.
作者 陶琳 TAO Lin(China Raiway Design Corporation,Tianjin 300308,China)
出处 《低温建筑技术》 2024年第2期149-152,共4页 Low Temperature Architecture Technology
关键词 石油管道 地铁盾构隧道 管线变形 oil pipeline subway shield tunnel pipeline deformation
  • 相关文献

参考文献4

二级参考文献25

共引文献8

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部