摘要
随着大直径PHC管桩在地基基础建设中的不断应用,如何保障管桩在复杂地基条件下的成桩质量和承载能力,逐渐成为基础工程建设者越来越关心的问题。针对太原武宿国际机场T3航站楼工程复杂基础结构施工,通过合理布置挤密碎石桩,同时科学设计大直径PHC管桩参数及沉桩工艺,成功消除了桩间土的液化性质,保障了成桩质量,最终确保了复杂液化地基下大直径PHC管桩的承载能力。
With the continuous popularization of large diameter PHC pipe piles in foundation construction,how to ensure the pile quality and bearing capacity of pipe piles under complex foundation conditions has gradually become a more and more concerned issue for foundation engineering builders.Aiming at the complex infrastructure construction of terminal 3 of Taiyuan Wusu international airport,reasonable arrangement of compacting gravel piles,scientific design of parameters and pile driving technology of large diameter PHC pipe piles have successfully eliminated the liquefaction property of soil between piles,guaranteed the pile quality,and finally ensured the bearing capacity of large diameter PHC pipe piles under complex liquefaction foundation.
作者
詹新彬
刘成
蔡永鑫
范金鹏
徐曈
Zhan Xin-bin;Liu Cheng;Cai Yong-xin;Fan Jin-peng;Xu Tong
出处
《建筑技术开发》
2024年第3期86-88,共3页
Building Technology Development
关键词
大直径PHC管桩
复杂基础
液化地基
管桩沉桩
large diameter PHC pipe pile
complex foundation
liquefied foundation
pipe pile sinking pile