摘要 RB是辅机故障减负荷(RUNBACK)的简称。如果火力发电机组在正常运行过程中出现锅炉侧或汽轮机侧重要辅机跳闸的工况,为防止事故进一步扩大,机组负荷指令将会按照预先设定的速率快速下降,在保证机组不灭火甚至跳闸的前提下,降至剩余运行辅机所能允许的负荷水平为止。为此,大型机组自动控制中设计了此功能,一旦发生机组某一重要辅机故障,机组则自动快速减负荷至实际工况所能达到的最大负荷值上稳定运行。 RB is the abbreviation of auxiliary equipment fault load reduction(RUNBACK).If an important auxiliary equipment trips on the boiler side or turbine side during normal operation of a thermal power unit,in order to prevent the accident from further expanding,the unit load instruction will decrease rapidly according to a preset rate,and under the premise of ensuring that the unit does not flame out or even trip,it will drop to the load level allowed by the remaining running auxiliary equipment.To this end,this function is designed in the automatic control of large units.Once a fault occurs in an important auxiliary equipment of the unit,the unit will automatically and quickly reduce the load to the maximum load value that can be achieved under the actual working conditions and operate stably.
作者 侯江 HOU Jiang(Datang International Power Generation Co.,Ltd.,Zhangjiakou Power Generation Company,Zhangjiakou 075133,China)
出处 《应用能源技术》 2023年第11期23-27,共5页 Applied Energy Technology
关键词 RB 火力发电 重要辅机 跳闸 灭火 自动 稳定运行 RB thermal power generation important auxiliary equipment tripping flameout automatic stable operation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部