摘要
以文家坡煤矿4105工作面深埋覆水煤层开采为例,采用相似材料模拟和数值模拟方法,研究覆岩破坏和裂隙带发育规律,探究深埋煤层开采对红岩河安全的影响。研究表明:当工作面不断推进,采空区面积随之增加,覆岩在重力作用下发生弯曲变形,形成离层;当重力超过岩石变形极限时,覆岩会破坏变形,部分离层垮落消失,在垮落体上部发育新离层,两侧形成裂隙;4105工作面垮落带高度稳定在164 m;随着工作面的不断推进,导水裂隙带高度逐步上升,最终稳定在244 m;地裂缝自地表向下延伸32 m;导水裂隙带上方存在414 m的岩层做保护层,未导通地表,未与地裂缝沟通,因此红岩河不会发生渗漏,煤层的开采不会对红岩河产生影响。
In this paper,taking the mining of deep-buried water-covered coal seam in 4105 working face of Wenjiapo Coal Mine as an example,similar material simulation and numerical simulation methods are used to study the law of overburden failure and fracture zone development,and to explore the impact of deep-buried coal seam mining on the safety of Hongyan River.The research shows that when the working face continues to advance,the goaf area increases,and the overlying rock is bent and deformed under the action of gravity to form a separation layer.When the gravity exceeds the rock deformation limit,the overlying rock will be destroyed and deformed,and some separation layers will collapse and disappear.New separation layers are developed in the upper part of the caving body,and cracks are formed on both sides.The caving zone height of 4105 working face is stable at 164 m.With the continuous advancement of the working face,the height of the water-conducting fracture zone gradually increased and eventually stabilized at 244 m.The ground fissures extend 32 m downward from the surface.There is a 414 m rock layer above the water-conducting fracture zone as a protective layer,which is not connected to the surface and not communicated with the ground fissure.Therefore,Hongyan River will not leak,and the mining of coal seams will not affect Hongyan River.
作者
孙学阳
邵宪赟
郑懿敬
张天宇
赵振宇
谢桐
SUN Xueyang;SHAO Xianyun;ZHENG Yijing;ZHANG Tianyu;ZHAO Zhenyu;XIE Tong(School of Geology and Environment,Xi’an University of Science and Technology,Xi’an 710054,China;Key Laboratory of Mine Geological Hazards Mechanism and Control,Xi’an 710054,China)
出处
《煤矿安全》
CAS
北大核心
2024年第5期195-203,共9页
Safety in Coal Mines
基金
国家自然科学基金资助项目(41272388,51674195)
陕西省自然科学基础研究计划资助项目(2023-JC-YB-272)。
关键词
覆水采煤
相似材料模拟
导水裂隙带
覆岩破坏
水害
coal mining over water
similar material simulation
water-conducting fracture zone
overburden failure