摘要
获取边坡的监测数据进行分析,并预测其接下来的变化趋势,具有重要的意义。本文以贵州省福泉市高坪矿区英坪矿段内边坡工程项目为研究对象,对监测数据采用时间序列AR(P)模型方法进行了分析与预测。研究结果表明,模型拟合的结果和预测精度较好地反映了监测点的变化趋势,可为矿区边坡模型建立和监测数据的预测提供一定的参考。
It is of great significance to obtain the monitoring data of slope for analyzing and predicting its next change trend.Taking the slope engineering project in Yingping section of Gaoping mining area in Fuquan city,Guizhou province as the research object,this pa-per analyzes and forecasts the monitoring data by using the time series AR(P)model method.The results show that the fiting results and prediction accuracy of the model can better reflect the change trend of monitoring points,and can provide a certain reference for the establishment of slope model and the prediction of monitoring data in mining area.
作者
陈子江
CHEN Zijiang(Guizhou Geology and Mineral Foundation Engineering Co.,Ltd.,Guiyang 550081,China;Institute of Geophysical and Geochemical Exploration of Guizhou Provincial Bureau of Geology and Mineral Exploration and Development,Guiyang 550018,China)
出处
《测绘与空间地理信息》
2024年第7期203-206,214,共5页
Geomatics & Spatial Information Technology