Scheduling Model and Algorithm of Construction Equipment under Milestone Constraint

下载PDF
导出
摘要 The scheduling of construction equipment is a means to realize network planning.With the large-scale and low-cost requirements of engineering construction,the cooperation among members of the engineering supply chain has become very important,and effective coordination of project plans at all levels to optimize the resource management and scheduling of a project is helpful to reduce project duration and cost.In this paper,under the milestone constraint conditions,the scheduling problems of multiple construction devices in the same sequence of operation were described and hypothesized mathematically,and the scheduling models of multiple equipment were established.The Palmer algorithm,CDS algorithm and Gupta algorithm were respectively used to solve the optimal scheduling of construction equipment to achieve the optimization of the construction period.The optimization scheduling of a single construction device and multiple construction devices was solved by using sequencing theory under milestone constraint,and these methods can obtain reasonable results,which has important guiding significance for the scheduling of construction equipment.
作者 Miao HU
出处 《Meteorological and Environmental Research》 2024年第3期32-35,41,共5页 气象与环境研究(英文版)
  • 相关文献

参考文献2

二级参考文献16

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部