摘要
旨在探讨大跨度桥梁吊装施工技术的优化策略及其创新应用,以解决当前技术应用中面临的诸多挑战。通过分类分析吊装施工技术的特点,研究了现有技术在设备选择、施工流程及安全保障方面的不足。采用综合评估法对不同设备的性能进行对比,结合仿真模拟技术优化吊装施工流程,并运用安全评估模型强化安全措施。研究结果表明,优化后的吊装施工技术能够有效提高施工效率,降低安全风险,并适应复杂工程环境的需求。研究结论指出,合理的设备配置、科学的施工流程及全面的安全保障措施是实现大跨度桥梁吊装施工高效、安全的关键。
The aim is to explore the optimization strategies and innovative applications of large-span bridge hoisting construction technology,in order to address the many challenges faced in current technological applications.By classifying and analyzing the characteristics of hoisting construction technology,the shortcomings of existing technologies in equipment selection,construction process,and safety assurance were studied.Adopt a comprehensive evaluation method to compare the performance of different equipment,combine simulation technology to optimize the lifting construction process,and use a safety evaluation model to strengthen safety measures.The results indicate that the optimized lifting construction technology can effectively improve construction efficiency,reduce safety risks,and adapt to the needs of complex engineering environments.The research conclusion points out that reasonable equipment configuration,scientific construction process,and comprehensive safety measures are the key to achieving efficient and safe lifting construction of large-span bridges.
作者
苏勇
Su Yong(SRBG Bridge Engineering Co.,Ltd.,Chengdu,Sichuan 610000)
出处
《现代工程科技》
2024年第17期17-20,共4页
Modern Engineering Technology
关键词
大跨度桥梁
吊装施工技术
架桥机
long span bridges
lifting construction technology
bridge erecting machine