摘要
针对单节超长预应力管桩在填海陆域区施工受限的问题,提出采用高桩架限位和液压冲锤沉桩的施工方法。通过加装限位抱箍的沉桩限位架对大直径超长预应力管桩进行固定限位,起吊液压冲击锤对管桩进行沉桩,巨大的冲击能量配合特制的敞开式导向桩尖,管桩沉入导向性好、穿透能力强,实现管桩快速高效沉入至设计标高,形成相应的施工新技术。
In view of the restricted construction of single-section super-long prestressed piles in reclaimed land area,it is proposed to adopt the construction method of high pile frame limitation and hydraulic impact hammer for pile sinking.The pile sinking limit frame equipped with limit hoop was used to fix and limit the position of large diameter super-long prestressed pipe piles,and the hydraulic impact hammer was hoisted to sink the piles.The huge impact energy was combined with the special open-type guiding tip,which made the piles sinking guided and penetrating.The piles sinking to the design elevation quickly is realized and efficiently,and the corresponding new construction technology is formed.
作者
李欣霖
雷斌
邓乃匀
LI Xinlin;LEI Bin;DENG Naiyun(Shenzhen Geokey Construction Group Co.Ltd.,Shenzhen 518063,Guangdong,China;Shenzhen Gongkan Geotechnical Group Co.Ltd.,Shenzhen 518063,Guangdong,China;Shenzhen Geokey Group Co.Ltd.,Shenzhen 518063,Guangdong,China)
出处
《科技和产业》
2024年第20期219-226,共8页
Science Technology and Industry
关键词
预应力管桩
填海陆域区
垂直限位沉桩技术
液压冲击锤沉桩
reinforced concrete prestressed pipe pile
reclamation land area
vertical limit pile sinking technology
hydraulic impact hammer sinking pile