摘要
为降低地铁内涝事故灾害风险,基于事故致因“2-4”模型,分析了地铁内涝事故致灾因子,采用层次分析法构建了地铁内涝事故原因分析指标体系,确定了各风险因子的权重,并利用模糊综合评价法对地铁内涝事故进行了定量评估,识别出关键的影响因素。结果表明:地铁内涝事故一级指标中不安全动作与物态因素最重要,其中影响最大的指标包括擅自更改建筑设计、未按照要求检查水位情况、未及时排水、出入口不符合防汛标准等因素;习惯性不安全行为的权重位居第二,表明该指标因素较为重要,同时安全管理体系得分位居第二,表明该指标因素较易发生。对关键指标采取防范措施,可有效降低风险,从而减少地铁内涝事故的发生。
In order to avoid the disaster risk of subway waterlogging accidents,based on the 24 Model of accident causes,this paper analyzes the disaster factors of subway waterlogging accidents,constructs an analysis index system for the risk causes of subway waterlogging accidents,uses the hierarchical analysis method to determine the weights of risk factors,evaluates the legal quantity according to the fuzzy comprehensive evaluation,and then conducts importance research to identify key influencing factors.The results show that the unsafe action and physical state factors are the most important in the first-level indicators,among which the most influential influencing factors include unauthorized changes in building design,failure to check the water level as required,failure to drain water in time,and entrances and exits that do not meet flood control standards;habitual unsafe behavior is weighted second,and the indicator factor is more important;the average score of the safety management system is secondary,and the impact factor is more likely to occur.Taking preventive measures against key influencing factor indicators can effectively avoid risks,thereby reducing the occurrence of waterlogging accidents in subways.
作者
张江石
胡馨月
侯轩
李泳暾
李梓萌
高进东
ZHAGN Jiangshi;HU Xinyue;HOU Xuan;LI Yongtun;LI Zimeng;GAO Jindong(School of Emergency Management and Safety Engineering,China University of Mining and Technology(Beijing),Beijing 100083,China;China Three Gorges Renewable(s Group)Co.,Ltd.,Beijing 100032;China Academy of Science and Technology,Beijing 100012,China)
出处
《安全与环境工程》
CAS
CSCD
北大核心
2024年第6期111-117,共7页
Safety and Environmental Engineering
基金
国家卫生健康委粉尘危害工程防护重点实验室2022年度开放课题项目(KLECDH20220101)。
关键词
安全工程
地铁内涝
24Model
层次分析法
模糊综合评价法
safety engineering
subway waterlogging
24Model
analytic hierarchy process
fuzzy comprehensive evaluation method