摘要
10kV配电线路中直线杆横担及绝缘子损坏十分常见,及时更换隐患设备是增加供电可靠性的重要保障手段。目前上海市电力公司以绝缘高架车带电调换法为主,但仍有许多工作环境绝缘高架车无法胜任。介绍了一种新工具,能够在任意环境中进行直线杆横担及绝缘子调换。
The straight pole cross arms and insulators of 10kV distribution line are vulnarable to damage,so the timely replacement of devices with hidden problems is important to increase power supply reliability. In Shanghai Municipal Electric Power Company,the live replacement mainly depends on the insulated cherry pickers,yet incompetent in many working environments. Therefore,this paper introduces a new tool for the replacement,applicable in any working environment.
出处
《华东电力》
北大核心
2014年第10期2109-2111,共3页
East China Electric Power
关键词
配电线路
三相导线同步提升
绝缘工具
提升抱杆
distribution line
three-phase wires syncrolift
insulation tool
lift holding pole