摘要
对超高层与大型冷冻站等空调工程中的重型设备吊装,结合交通路况、现场荷载与结构空间等,对"竖吊平拖"、"构件组装"法及三种组装型式作比较,高效完成了设备吊装。
For the hoisting of heavy equipment in AC projects such as super high-rise buildings and large-scale refrigeration stations,combined with the traffic conditions,field load and structural space,the"vertical lifting and horizontal dragging","component assembly"method and three assembly types were compared,and the equipment hoisting was completed efficiently.