非能动核电厂钢制安全壳顶封头拼装支架优化设计

Optimization Design of Steel Containment Head Assembly Support for Nuclear Power Plant with Passive Safety
下载PDF
导出
摘要 非能动核电厂钢制安全壳顶封头拼装支架是保障顶封头拼装形状尺寸的主要装置。本文分析了原有顶封头拼装支架工艺,提出了一种新型顶封头拼装支架。经工程验证,新型顶封头拼装支架在缩短组装工期、降低制造成本、便于运输等方面有显著的效果。 The steel containment top head assembly support of passive nuclear power plant is the main device to ensure the shape and size of the top head assembly.In this paper,the technology of the original top head assembly support is analyzed,and a new top head assembly support is proposed.Through engineering verification,the new top head assembly support has significant effects in shortening the assembling period,reducing the manufacturing cost,and facilitating transport.
作者 王燕辉 张学勇 王奕清 王成才 杨照东 WANG Yan-hui;ZHANG Xue-yong;WANG Yi-qing;WANG Cheng-cai;YANG Zhao-dong(Shandong Nuclear Power Equipment Manufacturing Co.,Ltd.,Haiyang,Shandong Prov.265118,China)
出处 《中国核电》 2023年第2期264-268,共5页 China Nuclear Power
基金 国家科技重大专项CAP1400核岛关键建造调试技术(2018ZX06002002)研究子课题三专题4:模块化建造技术经济性研究
关键词 非能动核电厂 钢制安全壳 顶封头 拼装支架 结构优化 passive nuclear power plant steel containment top head assembly support structural optimization
  • 相关文献

参考文献4

二级参考文献16

  • 1郭建军.压力容器对接焊接接头对口错边量的控制[J].压力容器,2005,22(4):50-54. 被引量:7
  • 2JB/T4709-2000.钢制压力容器焊接规程[S].[S].,..
  • 3ASME锅炉及压力容器规范,第Ⅲ卷:核设施部件建造规则,第1册NE分卷MC级部件[S].
  • 4ASME锅炉及压力容器规范,第Ⅲ卷:核设施部件建造规则,NCA分卷,第1、2册的总要求[S].
  • 5王垣;鹿松;魏俊明.AP1000首次大型模块的运输和吊装[A]{H}北京,2010.
  • 6姜新杰.核电站 CV 安全壳的运输[J]城市建设理论研究(电子版),2012.
  • 7卜一德.起重吊装计算及安全技术[M]{H}北京:中国建筑工业出版社.
  • 8林诚格;郁祖盛.非能动安全先进核电厂AP1000[M]北京:原子能出版社,20087196-199.
  • 9刘海滨;詹文辉.CAP-PSA1-GSC-0706非能动安全壳冷却系统故障树分析[R]上海:上海核工程研究设计院,2009.
  • 10张忞隽.PC2-15-1FT-21附录A6安全壳喷淋系统故障树分析[R]上海:上海核工程研究设计院,2005.

共引文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部