核电厂换料大修人力精准管理办法分析与探索

Analysis and Exploration of the Precision Manpower Management Method for Nuclear Power Plant Refueling Overhaul
下载PDF
导出
摘要 技术方案、工作文件、人员物资、执行计划、风险分析五个方面的充分准备是核电厂换料大修的基本条件,也是取得优良业绩的必要保障。其中人员保障是所有工作开展的基础,在所有参修人员中,合作伙伴的人力是不确定性最高的一类。因此,如何精确且及时锁定合作伙伴人力并推动人员及时到岗是一项非常有实际运用意义的课题。通过对国内某核电厂近几轮大修的工作、人力情况进展进行数据分析,建立科学人力数学模型,以便基准锁定大修人力需求,并在最近几轮大修进行实践验证,给出后续大修人力精准管控方向。 The full preparation of technical solutions,work documents,personnel,material,execution plan,and risk analysis is the basic condition for the overhaul of nuclear power plant,which is also a necessary guarantee for achieving excellent performance.Among them,personnel protection is the basis for all work.Among all participants,the partners'manpower is the category of the most uncertainty.Therefore,how to accurately and timely lock the partner's manpower and promote personnel to work in time is a very practical topic.This article will establish a scientific human mathematical model through data analysis of the work and manpower situation of a domestic nuclear power plant in recent rounds of overhaul,so that the benchmark locks the demand for large-scale manpower,and verify it precision control direction.
作者 汪有长 李国强 赵中毫 WANG You-zhang;LI Guo-qiang;ZHAO Zhong-hao(Guangxi Fangchenggang Nuclear Power Co.,Ltd.,Fangchenggang,Guangxi Prov.538001,China)
出处 《中国核电》 2023年第2期226-230,共5页 China Nuclear Power
关键词 大修 人力 精准 分析 overhaul manpower accurate analysis
  • 相关文献

参考文献2

二级参考文献2

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部