大岗山水电站坝肩边坡地质条件复杂,断层、岩脉、卸荷裂隙密集带、深部卸荷带及节理裂隙发育。为对该边坡在开挖支护过程中的应力、变形情况进行分析,采用弹黏塑性有限元软件EVP3D,利用弹塑性有限元法进行边坡稳定性的三维有限元计算,揭示边坡可能的失稳部位,对初拟的施工程序的合理性进行评价,并对边坡的支护方案提出建议。
The abutment slope at Dagangshan Hydropower Project has complex geological conditions with faults,dikes,unloading crack intensive belt,deep unloading belt and developed joint fissures.In order to analyse the stress and deformation of the slope during the slope excavation and support,3D elastoplastic finite element simulation is performed with elastoplastic finite element method by the elasto-viscoplastic finite element software EVP3D,the possible failure location of the slope can be revealed,and the effectiveness of a suggested construction procedure can be evaluated.A suggestion for the supporting scheme is proposed.
作者
漆祖芳
唐忠敏
姜清辉
位伟
潘少华
QI Zu-fang;TANG Zhong-min;JIANG Qing-hui;WEI Wei;PAN Shao-hua(State Key Laboratory of Water Resources and Hydropower Engineering Science,Wuhan University,Wuhan 430072,China;Chengdu Hydroelectric Investigation and Design Institute,China Hydropower Consulting Group,Chengdu,Sichuan 610072,China)
出处
《岩土力学》
EI
CAS
CSCD
北大核心
2008年第S01期161-165,共5页
Rock and Soil Mechanics
基金
教育部新世纪优秀人才支持计划项目(No.NCET-07-0632)
国家自然科学基金雅砻江水电开发联合研究基金重点项目(No.50539100)。
关键词
大岗山水电站
坝肩边坡
开挖
加固
有限元
Dagangshan Hydropower Project
abutment slope
excavation
reinforcement
finite elements