期刊文献+

The 10-billion-yuan Energy Storage Battery Project Signed

原文传递
导出
摘要 On November 16th,Jiangsu Heng An Energy Storage Technology Co.,Ltd.(referred to as“Jiangsu Heng An”)held a groundbreaking ceremony for a project with an annual production of 10GWh of zinc bromide liquid flow energy storage battery in Suqian High tech Zone,Jiangsu.The project has a total investment of RMB 10 billion,with a land area of 920 Mu(~613,333.33 m2),and 20 specialized automated production lines for energy storage batteries are planned to be built.After being put into production to a full capacity,it can achieve a production value of RMB 20 billion and an annual sales revenue of RMB 18 billion.Data show that Jiangsu Heng An was established in 2021,as an indirect wholly-owned subsidiary of China Anchu Energy Storage Group Limited(02399.HK).
出处 《China Nonferrous Metals Monthly》 2023年第12期6-8,共3页 中国有色月刊(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部