摘要
为解决传统城市街道规划设计理念难以完整贯彻实现的问题,本文探讨了基于新城建设的街道设计实施机制。首先,分析传统城市街道设计实施面临的挑战;其次,从管理架构、方案审查和全过程督导角度总结先进城市街道设计实施经验;最后,阐述雄安新区在街道设计导则编制、管理架构设计、审查机制构建、设计师全程把控等方面的建设经验,并提出未来发展思考。
To solve the problems that traditional urban street planning and design concepts are difficult to fully implement,the street design implementation mechanism based on a new city construction was innovatively researched.Firstly,analyse the challenges in the implementation of traditional urban street designs.Secondly,summarize the advanced experiences of urban street design implementation from the perspective of management structure,program review and comprehensive supervision.Finally,expound on the construction experience of Xiong'an New Area in street design guidelines design,management structures construction,review mechanisms and designers control,and put forward thoughts on future development.
作者
张程瀚
李劲松
张志学
李冲
陆嘉恺
ZHANG Chenghan;LI Jinsong;ZHANG Zhixue;LI Chong;LU Jiakai(Shenzhen Urban Transport Planning Center Co.,Ltd,Shenzhen 518000,China;China Railway Beijing Group Co.,Ltd,Beijing 100071,China;Construction and Traffic Management Bureau of Xiong'an New Area,Xiong'an New Area 071700,China;CCCC First Highway Consultants Co.,Ltd,Xi'an 710068,China)
出处
《交通与运输》
2024年第S01期211-214,共4页
Traffic & Transportation
关键词
雄安新区
城市建设
慢行交通
街道设计
实施机制
Xiong'an New Area
Urban construction
Non-motorized transportation
Street design
Implementation mechanism