5KISHK M, Al-HAJJ A. Fuzzy modelling of life cycle costs of alternatives with different lives [C]// Glasgow Caledonian University. The 16th Annual Conference of the Association of Researchers in Construction Management (ARCOM). Glasgow: IEEE, 2000: 92-101.
6ERTO P, LANZOTTI A. Statistical model life cycle costreliability for a new mass transit vehicle[C]//Wessex Institute of Technology. Proceedings of the 4th International Conference on Computer Aided Design, Manufacture and Operation in the Railway and Other Mass Transit Systems. Southampton: Computational Mechanics Publ, 1994 : 102-109.
7KISHK M, Al-HAJJ A. A fuzzy model and algorithm to handle subjectivity in life cycle costing based decision-making[J]. Journal of Financial Management of Property and Construction, 2000, 5(1/2): 93-104.
8JUN H K, KIM J H. Life cycle cost modeling for railway vehicle[C]//Korea Railroad Research Institute. Proceeding of International Conference on Electrical Machines and Systems. Seoul: IEEE, 2007: 1989-1994.