期刊文献+

Inner Mongolia plans to set up 10 GW centralized wind and photovoltaic power projects

下载PDF
导出
摘要 It is reported that the Energy Bureau of Inner Mongolia Autonomous Region plans to construct10 GW centralized wind power and photovoltaic power projects this year.According to the"Notice from Energy Bureau of Inner Mongolia Autonomous Region on the development and construction of wind power and photovoltaic power in 2021",Inner Mongolia of China will construct a number of centralized and grid-connected projects of wind power and photovoltaic power basing on abundant wind and solar energy resources in this area.The projects will focus on the areas of desert,coal mining subsidence,open coal mining dump and along the border.
出处 《China Rare Earth Information》 2021年第3期3-3,共1页 中国稀土信息(英文)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部