摘要
叙毕铁路新高坡隧道岩溶发育强烈,施工过程中揭示巨型溶洞,且溶洞侵入隧道,严重影响施工及运营安全。结合岩溶整治决策因素,以隧道施工过程揭示的溶洞为典型处理案例,分析总结不同位置充填溶洞的处理原则。结合岩溶形态、地质条件,充分考虑隧道位置、充填物性质、地下水等影响因素,在保证结构稳定并兼顾施工与运营安全的前提下,从结构型式、基底处理、永久排水通道等方面提出具体处理措施,对类似岩溶地区隧道工程具有重要的参考价值。
The karst in the Xingaopo Tunnel on the Xuyong-Bijie Railway is strongly developed,and giant karst caves are revealed during the construction process,and the caves invade the tunnel,seriously affecting the safety of construction and operation.Based on the decision-making factors of karst treatment,karst caves revealed during tunnel construction are taken as a typical treatment case,to analyze and summarize the treatment principles for filling-type karst caves at different positions.By combining with karst morphology and geological conditions and fully considering factors such as tunnel location,filling properties and groundwater,while ensuring structural stability and considering construction and operation safety,specific treatment measures are proposed from aspects of structural type,foundation treatment and permanent drainage channel,which has important guiding value for tunnel engineering in similar karst areas.
作者
唐勇
唐进才
李瑞林
唐俊林
TANG Yong;TANG Jincai;LI Ruilin;TANG Junlin(Sichuan Shudao Railway Investment Group Co.,Ltd.,Chengdu 610032;Southern Sichuan Inter-city Railway Co.,Ltd.,Zigong 643002;Xuzhen Railway Co.,Ltd.,Luzhou 646699)
出处
《现代隧道技术》
CSCD
北大核心
2023年第S01期138-147,共10页
Modern Tunnelling Technology
基金
四川省科技计划资助项目(2022JDJQ0017).
关键词
铁路隧道
岩溶空腔
充填溶洞
整治措施
Railway tunnel
Karst cavities
Filling-type karst caves
Treatment measures