摘要 在重叠盾构隧道的掘进过程中,后建隧道施工不可避免地对地表及先建隧道产生一定影响,导致地表沉降、先建隧道结构发生变形,甚至影响结构安全,有必要对重叠盾构隧道掘进进行加固措施研究。当重叠盾构近接间距为强影响区时,为降低重叠隧道掘进相互影响,选取素混凝土桩、素混凝土桩+二次全周注浆、素混凝土桩+二次半周注浆及素混凝土桩+二次半周注浆+洞内钢支撑4种加固方案,依据地表隆沉及洞周收敛等评价指标进行判别,确定“素混凝土桩+二次注浆+洞内钢支撑”联合加固措施效果最佳,地表沉降最大值较未加固减少约38%,洞周收敛值可控制在3 mm内,满足施工控制要求。 In the excavation process of overlapping shield tunnels,the subsequent constructed tunnel will inevitably have a specific influence on the ground surface and the antecedent constructed tunnel,resulting in the surface settlement and deformation of the antecedent constructed tunnel structure and even affecting structural safety.Therefore,it is necessary to study the reinforcement measures of overlapping shield tunnelling.When overlapped shield tunnels locate closely in the strong impact area,in order to reduce the interaction of overlapped tunnelling,it selects and compares four types of reinforcement schemes,including plain concrete pile,plain concrete grouting pile+second full-perimeter grouting,plain concrete pile+second half-perimeter grouting and plain concrete pile+second half-perimeter grouting+steel brace inside tunnel.According to evaluation index such as surface settlement/heave and perimeter convergence,the combined reinforcement measures of"plain concrete pile+secondary grouting+steel support in the tunnel"show the best performance.The maximum surface settlement is reduced by approximately 38%compared with that without reinforcement,and the convergence value around the tunnel can be controlled within 3 mm,meeting the construction control requirements.
作者 李雪 龚子邦 张玉申 陈霖 任伟 刘瑜志 LI Xue;GONG Zibang;ZHANG Yushen;CHEN Lin;REN Wei;LIU Yuzhi(School of Geoscience and Technology,Southwest Petroleum University,Chengdu 610500)
出处 《现代隧道技术》 CSCD 北大核心 2022年第S01期918-927,共10页 Modern Tunnelling Technology
基金 国家自然科学基金(No.51808469) 四川省自然科学基金项目(2022NSFSC0442) 上海市轨道交通结构耐久与系统安全重点实验室开放基金(No.R201902)
关键词 重叠隧道 砂卵石 加固措施 现场监测 Overlapping tunnel Sandy pebble Reinforcement measures Field monitoring