期刊文献+

波纹钢连拱明洞公路隧道监测数据分析与数值模拟研究 被引量:5

Analysis on Monitoring Data and Numerical Simulation of Corrugated Steel Fabricated Multi-arch Open-cut Highway Tunnel
下载PDF
导出
摘要 依托于高山寨波纹钢装配式连拱明洞项目,对波纹钢、混凝土的应变监测数据进行整理,分析结构的受力变形特征,将监测数据的变化趋势分为5个阶段,并对典型断面稳定时的应变数据加以分析。利用有限元软件对典型断面进行数值模拟,将监测数据与数值计算结果进行对比,证明其合理性和可靠性,通过分析计算结果发现明洞两侧拱脚受力相对较大,在设计与施工时应引起重视。 Based on the Gaoshanzhai corrugated steel fabricated multi-arch open-cut tunnel project,this paper collates the strain monitoring data of corrugated steel and concrete,summarizes the stress and deformation characteristics of the structure,divides the change trend of the monitoring data into five stages,and analyzes the strain data when the typical section is stable.The typical section is numerically simulated by using the finite element software,and the monitoring data are compared with the numerical calculation results to prove its rationality and reliability.Through the analysis and calculation results,it is found that the stress on the arch foot on both sides of the open-cut tunnel is relatively large,which should be paid attention to in the design and construction.
作者 白祖应 黄煊博 丁文其 张清照 BAI Zuying;HUANG Xuanbo;DING Wenqi;ZHANG Qingzhao(Yunnan Jiaotou Pulan Expressway Co.,Ltd.,Puer 665000;Department of Geotechnical Engineering,College of Civil Engineering,Tongji University,Shanghai 200092;Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Tongji University,Shanghai 200092)
出处 《现代隧道技术》 CSCD 北大核心 2022年第S01期635-642,共8页 Modern Tunnelling Technology
基金 国家重点研发计划项目(2021YFC3002000) 云南省交通运输厅科技创新及示范项目(SL194-GCB-2020-38)
关键词 波纹钢装配式结构 连拱明洞 现场监测 数值模拟 Corrugated steel fabricated structure Double-arch open cut tunnel On site monitoring Numerical simulation
  • 相关文献

参考文献9

二级参考文献65

共引文献79

同被引文献42

引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部