觉巴山高海拔特长公路隧道施工通风优化研究 被引量:12

Study on Construction Ventilation Optimization in Juebashan High Altitude Extra-long Highway Tunnel
下载PDF
导出
摘要 对觉巴山隧道现阶段压入式施工通风效果进行现场实测,根据实测数据分析得出隧道内温度、湿度较高,粉尘浓度严重超标,风管破损严重,通风效果差,压入式通风难以满足高海拔特长隧道施工环境要求。根据觉巴山隧道正洞和导洞施工进度安排,进行巷道式施工通风设计,设计布置2组2×75 kW轴流风机,增设1组15 kW射流风机,较现阶段减少1组2×135 kW轴流风机,通风距离减为1 km,有效地减少了通风风阻,在保证通风效果的同时减少了通风成本。 According to the analysis of the measured data in Juebashan long highway tunnel,it is concluded that the temperature and humidity are high,the dust concentration seriously exceeds the standard,the air pipe is seriously damaged,the ventilation effect is poor,and the forced ventilation is difficult to meet the construction environment requirements of the long tunnel.According to the construction schedule of main and pilot tunnel of Juebashan tunnel,the design of gallery construction ventilation is carried out,with 2 groups of 2×75 kW axial flow fan,adding a group of 15 kw jet fan,reducing one group 2×135 kW axial flow fan,the ventilation distance is reduced to 1 km,effectively reducing the ventilation resistance,ensuring the ventilation effect and reducing the ventilation cost.
作者 蔡鹏飞 CAI Pengfei(China Railway 11th Bureau Group Second Engineering Co.,Ltd.,Shiyan 442000)
出处 《现代隧道技术》 CSCD 北大核心 2021年第S01期156-161,共6页 Modern Tunnelling Technology
关键词 特长公路隧道 高海拔 正导洞巷道式通风 现场实测 通风效果 Extra-long highway tunnel High altitude Gallery ventilation in main and pilot tunnel Field measurement Ventilation effect
  • 相关文献

参考文献7

二级参考文献44

共引文献88

同被引文献86

引证文献12

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部