摘要
丁辛醇装置透平压缩机组是中国石油四川石化有限责任公司21/8万吨/年丁辛醇装置核心设备。试车是确保压缩机能正常运行的前提,也是与生产厂家共同解决压缩运行问题的最佳时刻。在压缩机试车中,发现一些影响压缩机正常运行的问题,本文通过分析总结,找到相应对策,解决了影响压缩机正常运行的主要问题。
The butanol unit turbine compressor unit is core equipment of the 21/8 million tons per year for PetroChina Sichuan Petrochemical Co.,Ltd.,.Commissioning is a prerequisite to ensure the normal operation of the compressor,and it is also the best time to work with the manufacturer to solve the problem of compression operation.In the compressor test run,some problems affecting the normal operation of the compressor were found.Through analysis and summary,corresponding countermeasures were found to solve the main problems affecting the normal operation of the compressor.
作者
马明
舒正伟
姜波
Ma Ming;Shu Zhengwei;Jiang Bo(PetroChina Sichuan Petrochemical Co.,Ltd.,Chengdu,Sichuan 611900)
出处
《西部特种设备》
2020年第5期35-37,共3页
Western Special Equipment
关键词
温度显示
干气密封
联锁跳车
Temperature display
Dry gas seal
Interlock jumper