摘要 为提升工作面采出率,确定采用筑墙双巷无煤柱开采技术,基于巷道断面要求及筑墙双巷墙体所受压力计算结果,确定墙体采用0.8 m宽的C30混凝土,并对巷道支护方案进行了设计。应用结果表明:巷道围岩控制效果良好,筑墙双巷方案可满足相邻两个工作面回采需求。 In order to improve the recovery rate of the working face,the wall-building double lanes without coal pillar mining technology was adopted.Based on the roadway section requirements and the pressure calculation results of the wall of the wall-building double lanes,it is determined that the wall adopts C30 concrete with a width of 0.8m,and the roadway support scheme was designed.The application results show that the surrounding rock control effect of roadway is good,and the wall double lanes scheme can meet the mining requirements of two adjacent working faces.
作者 孙凯 Sun Kai(Hengyuan Mine of Jinneng Holding Coal Industry Group Co.,Ltd.,Jinzhong Shanxi 045400,China)
出处 《同煤科技》 2022年第2期49-51,共3页 Datong Coal Science & Technology
关键词 筑墙双巷 无煤柱开采 矿压监测 Wall-building double lanes Non-pillar mining Mine pressure monitoring
  • 相关文献

参考文献2

二级参考文献12

共引文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部