摘要
以某高速公路在建隧道初期支护侵限段为工程背景,通过增设临时竖向及斜向支撑、增设超前中管棚、增设锁脚锚管等措施,为换拱段提供支护与预加固,保证了换拱能够安全顺利进行,以期对类似的工程提供参考。
Selecting initial support intrusion section of a highway tunnel during the construction as the engineering background,through taking measures,such as adding temporary vertical and oblique support,adding leading pipe shed and anchor pipe,to provide support and pre-reinforcement for arch replacement section,and ensure that arch replacement can be carried out safely and smoothly,so as to provide reference for similar projects.
作者
王艳波
WANG Yan-bo(Shanxi Transportation Survey&Design Institute Co.,Ltd.,Taiyuan,Shanxi 030032,China)
出处
《山西交通科技》
2020年第1期57-59,83,共4页
Shanxi Science & Technology of Transportation
关键词
隧道
初支侵限
换拱
tunnel
initial support intrusion
arch replacement