通过对2007年与2018年公路隧道工程新旧定额造价的比较,分析了新旧定额的差异,并以山西省若干个已完成高速公路项目施工图预算为例,分析了新旧定额对工程造价的影响。
According to the comparison of the highway tunnel project quota cost in 2007 and 2018,the difference of old and new quotas was analyzed.And based on several completed construction drawing budget of Shanxi highway projects,the influence of new and old quotas on project cost was analyzed.
作者
雷晓明
LEI Xiao-ming(Department of Transportation of Shanxi Province,Highway Traffic Engineering Quota Station,Taiyuan,Shanxi 030006,China)
出处
《山西交通科技》
2019年第6期97-100,共4页