摘要 胶凝砂砾石坝在填筑中所用砂砾石料不洗筛,且骨料的含水率不一、级配分布广。为确定在设计配合比下的坝体压实填筑控制指标,开展了两种胶凝材料配比在3种铺料厚度和3种碾压遍数条件下的现场碾压试验。结果表明,在各种试验条件下,45cm和55cm铺料厚度均较65cm铺料厚度的压实更充分。根据28d强度值和碾压遍数与碾压后干密度的关系,最终形成了9项内容的施工控制参数。本研究为胶凝砂砾石坝填筑提供了技术控制参数,该成果对类似工程具有参考价值和推广意义。 In the construction of cemented sand and gravel dams,the use of uncleaned and unscreened sand and gravel materials,with varying moisture content and wide particle size distribution,is common.In order to investigate the control indicators for compacting the dam under the designed mix ratio,on-site compaction tests were conducted under three different bedding thicknesses and three levels of rolling passes for two types of cementitious materials.The results show that,under various test conditions,compaction is more thorough with bedding thicknesses of 45cm and 55cm compared to a thickness of 65cm.Based on the relationship between 28-day strength values,the number of rolling passes,and postcompaction dry density,nine construction control parameters are ultimately established.This research provides technical control parameters for the construction of cemented sand and gravel dams,and its findings have reference value and practical significance for similar engineering projects.
作者 和振兴 谭敏 鲁达 HE Zhenxing;TAN Min;LU Da(Lijiang Water Resources and Hydropower Survey and Design Institute Co.,Ltd.,Lijiang 674100,China;Ninglang Yi Autonomous County Water Affairs Bureau,Lijiang 674100,China)
出处 《水利建设与管理》 2023年第S01期81-86,共6页 Water Conservancy Construction and Management
关键词 胶凝砂砾石坝 填筑 配合比 碾压 施工参数 cemented sand and gravel dams construction mix ratio compaction construction parameters
  • 相关文献

参考文献10

二级参考文献42

  • 1贾金生,马锋玲,李新宇,陈祖坪.胶凝砂砾石坝材料特性研究及工程应用[J].水利学报,2006,37(5):578-582. 被引量:121
  • 2杨首龙.CSG坝筑坝材料特性与抗荷载能力研究[J].土木工程学报,2007,40(2):97-103. 被引量:49
  • 3孙明权,杨世锋,张镜剑.超贫胶结材料本构模型[J].水利水电科技进展,2007,27(3):35-37. 被引量:29
  • 4SL319-2005,混凝土重力坝设计规范[S].
  • 5赖福梁,林琳.贫胶粗粒料筑坝新技术在洪口水电站的设计与实施[C]..第五届碾压混凝土坝国际研讨会.,..
  • 6.华能澜沧江功果桥水电站上游围堰胶凝砂砾石材料施工技术要求[R].中国水电顾问集团西北勘测设计研究院,2009..
  • 7.澜沧江功果桥水电站工程可行性研究报告[R].中国水电顾问集团西北勘测设计研究院,2006..
  • 8SL265-2001.水闸设计规范[S].[S].,..
  • 9SL274-2001.碾压式土石坝设计规范[S].[S].,..
  • 10Raphael J M.The Optimum Gravity Dam[A].Rapid Construction of Concrete Dams[ C ].ASCE,1970.221-224.