新疆阿尔塔什水利枢纽工程大坝坝料计量管控措施浅析 被引量:2

Analysis on dam material measurement and control measures of Xinjiang Altash Water Conservancy Project
下载PDF
导出
摘要 混凝土面板堆石坝坝料填筑施工具有工程量大、种类多、运距远的特点,在实际填筑计量时,施工总承包方对业主和作业队采用的计量方式和计量单位不同,造成项目部与作业队之间对工程计量结果发生分歧。针对这一计量管理通病,阿尔塔什大坝项目部引进了先进的无线视频监控技术和智能坝料称重技术,并采用合理有效的管理措施,确保了坝料计量的准确性和有效性,确保了各方经济利益,提高了施工管理水平,使得工程进度、质量和成本得到较好的控制。 The filling construction of concrete face rockfill dam has the characteristics of large quantity,variety and long transportation distance.The general contractor of construction adopts different measurement methods and measurement units for the owner and the operation team in the actual filling measurement,and the project department and the operation team have different measurement results for the project.Altash dam project department has introduced the advanced wireless video monitoring technology and intelligent dam materials weighing technology,and adopt reasonable and effective management measures aiming at the common defect of measurement management,thereby ensuring the accuracy and effectiveness of dam material measurement,ensuring the economic interests of the parties,improving the construction management,and controlling the project schedule,quality and cost well.
作者 王真平 WANG Zhenping(Sinohydro Fifth Engineering Bureau Co.,Ltd.,Chengdu 610066,China)
出处 《水利建设与管理》 2020年第1期16-19,共4页 Water Conservancy Construction and Management
关键词 坝料填筑 计量数据转换 无线视频监控 智能坝料称重 dam filling conversion of measurement data wireless video monitoring intelligent dam material weighing
  • 相关文献

参考文献3

二级参考文献12

共引文献4

同被引文献9

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部