期刊文献+

风力发电项目升压站电气设备的安装调试及管理 被引量:6

Installation, debugging and management of electrical equipment in booster station of wind power project
下载PDF
导出
摘要 风力发电是一项重要的绿色能源工程。在建设施工中,必须重视风力发电项目升压站电气设备的安装、调试及管理工作。介绍风力发电项目升压站电气设备概况,并分别对风力发电项目升压站电气设备的安装、调试、管理进行分析探讨。 Wind power projects is an important green energy project.During construction,the attention must be paid to the installation,debugging and management work of booster station electrical equipment.This paper introduces the general situation of the electrical equipment of the wind power project booster station,and analyzes the installation,debugging and management of the electrical equipment of the wind power project booster station.
作者 郑树国 ZHENG Shuguo(China Anneng Group Second Engineering Bureau Co.,Ltd.,Xiamen 361021,Fujian,China)
出处 《水利水电技术(中英文)》 北大核心 2022年第S02期83-85,共3页 Water Resources and Hydropower Engineering
关键词 风力发电 升压站 电气设备 安装 调试 管理 wind power booster station electrical equipment installation debugging management
  • 相关文献

同被引文献24

引证文献6

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部