摘要
某抽水蓄能电站下水库大坝工程和地下厂房工程的砂石加工系统和部分生活营地依托开挖渣土场布置在狭小的沟谷内,本文介绍其砂石料加工系统建设和运行生产过程的噪声来源、分类、危害分析及其预防与控制措施建议。
The sand and gravel processing system and some living camps of the lower reservoir dam project and underground power house project of a pumped storage power station are arranged in a narrow valley relying on the excavated waste dump.This paper introduces the noise source,classification,hazard analysis,prevention and control measures during the construction and operation of its sand and gravel processing system.
作者
陈伯智
CHEN Bozhi(China Anneng Group Co.,Ltd.,Beijng 100055,China)
出处
《水利水电技术(中英文)》
北大核心
2022年第S02期196-199,共4页
Water Resources and Hydropower Engineering
关键词
狭小沟谷
砂石加工系统
噪声防治
措施建议
narrow valley
gravel processing system
noise control
measures and suggestions