丰满重建工程蓄水初期大坝工作性态分析

Analysis of dam performance of Fengman Reconstruction Project during initial impoundment period
下载PDF
导出
摘要 根据大坝安全监测资料,对丰满重建工程蓄水初期坝体及坝基的变形、渗流、应力等的时空分布规律进行了分析,进而对大坝整体工作性态进行了评价。监测成果表明:坝体及坝基变形符合重力坝的一般变化规律,变形量值在合理范围内,坝基帷幕防渗总体效果良好,坝踵坝趾均处于受压状态。大坝总体工作性态正常。 According to the monitoring data of the dam of the Fengman Reconstruction Project,the temporal and spatial distribution of deformation,seepage,and stress of the dam and foundation at the initial impoundment of water storage are analyzed,and then the overall performance of the dam is evaluated.The monitoring results showed that the deformation of the dam and foundation conforms to the general laws of the gravity dams.The dam deformation is within a reasonable range.The overall anti-seepage effect of dam foundation curtain is good.The dam heel and toe are all under compression.on the whole,the dam performance is normal.
作者 苗强 宿磊 商玉洁 乔承超 张振华 李辉 MIAO Qiang;SU Lei;SHANG Yujie;QIAO Chengchao;ZHANG Zhenhua;LI Hui(Fengman Dam Reconstruction Engineering Bureau of Songhua River Hydropower Co.,Ltd,Jilin 132108,Jilin,China;Fengman Hydropower Station,Jilin 132108,Jilin,China;China Institute of Water Resources and Hydropower Research,Beijing 100038,China)
出处 《水利水电技术(中英文)》 北大核心 2021年第S01期170-175,共6页 Water Resources and Hydropower Engineering
关键词 丰满重建工程 碾压混凝土重力坝 蓄水初期 工作性态分析 fengman reconstruction project RCC gravity dam initial stage of impoundment performance analysis
  • 相关文献

参考文献2

二级参考文献2

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部