摘要
结合惠南庄泵站工程及密云调水九级泵站工程的实际工作经验,从金属结构、水力机械、电气工程、自动化监控共4个专业的角度详细地总结出了大型泵站工程机电设备安装与土建施工的配合要点。
In combination with the practical working experiences from the constructions of Huinanzhuang Pumping Station and the nine-stages pumping stations for Miyun Reservoir,the key points of the coordination between the electromechanical equipment installation and the civil construction for large-sized pumping station are summarized herein from the professional aspects of metal structure,hydraulic machineries,electric engineering and automatic monitoring.
作者
洪中达
贾士光
董海天
HONG Zhongda;JIA Shiguang;DONG Haitian(Beijing Institute of Water,Beijing 100048,China)
出处
《水利水电技术》
北大核心
2019年第S02期56-59,共4页
Water Resources and Hydropower Engineering
关键词
大型泵站工程
机电
土建
配合
large-sized pumping station
electromechanical project
civil project
coordination