期刊文献+

大渡河水电站开发中水土流失环境问题分析 被引量:4

Analysis on the environmental problems of soil erosion in the development of Dadu River Hydropower Station
下载PDF
导出
摘要 根据社会经济发展和能源开发战略,四川大渡河规划开发22级水电站,水电站的建设必然造成对自然生态环境的影响。通过对枕头坝、深溪沟、瀑布沟、大岗山和泸定水电站的实地调查研究,文章从水土保持角度分析了大渡河水电开发施工建设期和大坝建成后对环境产生的影响,提出环境保护需建立评价指标,针对具体问题采取相应措施进行防治。 According to the strategy of social and economic development and energy development, 22 hydropower stations are planned and developed in Dadu River, Sichuan Province. The construction of hydropower stations will inevitably affect the natural ecological environment. Based on the field investigation and study of pillow dam, Shenxigou, Pubugou, Dagangshan and Luding Hydropower Stations, this paper analyzes the impact on the environment during the construction period of Dadu River hydropower development and after the completion of the dam from the perspective of soil and water conservation, and puts forward that evaluation indexes should be established for environmental protection, and corresponding measures should be taken to prevent and control specific problems.
作者 冯克义 FENG Keyi(Beijing Institute of Water Resources Planning and Design,Beijing 100044,China)
出处 《水利水电技术》 北大核心 2019年第S02期229-231,共3页 Water Resources and Hydropower Engineering
关键词 高陡边坡 项目区建筑物 弃渣 水土流失 high and steep slope buildings in the project area waste slag water and soil loss
  • 相关文献

参考文献4

二级参考文献5

  • 1钟敦伦,韦方强,谢洪.长江上游泥石流危险度区划的原则与指标[J].山地研究,1994,12(2):78-83. 被引量:24
  • 2GB50433-2008,开发建设项目水土保持技术规范[S].
  • 3张明,艾晓燕.黑龙江省大兴安岭地区呼玛河干流梯级水电站规划报告[R].哈尔滨:黑龙江省水利水电勘测设计研究院,2008.
  • 4国土资源部.县(市)地质灾害调查与区划基本要求[S].2000.
  • 5四川省水利电力厅.四川省中小流域暴雨洪水计算手册[M].1984.

共引文献3