摘要 连续刚构桥现浇段施工多受地形条件、墩高等因素的影响,多年来,已经形成了很多较为成熟的支架方案,如"井"形支架法、贝雷梁支架法等。结合元蔓高速新寨村2号大桥(73+130+73)m的特殊施工环境,在综合分析前人研究成果的基础上,提出了"△"钢立柱+贝雷梁吊篮体系半悬挂组合支架法,进行现浇段施工,并采用有限元软件Midas civil对支架体系受力性能进行计算分析。 The construction of cast-in-situ sections of continuous rigid frame bridges is mostly affected by factors such as terrain conditions and pier heights.Over the years,many more mature support schemes have been formed,such as the"well"-shaped support method,Beley beam support method and so on.Based on the special construction environment of the No.2 bridge(73+130+73)m of Xinzhai Village of Yuanman Expressway,this paper proposes a"△"steel column+Beilei beam based on a comprehensive analysis of previous research results.The semi-suspended combined bracket method of the hanging basket system is used for the construction of the cast-in-situ section,and the finite element software Midas civil is used to calculate and analyze the mechanical performance of the bracket system.
作者 杨龙 沈林丽 段永凤 朱秋峰 李应先 YANG Long;SHEN Linli;DUAN Yongfeng;ZHU Qiufeng;LI Yingxian(Yunnan Construction Investment Municipal General Contracting Department,Kunming,Yunnan 650000,China)
出处 《施工技术》 CAS 2020年第S01期1274-1276,共3页 Construction Technology
关键词 桥梁工程 连续刚构现浇段 组合支架 有限元分析 bridges continuous rigid frame cast-in-place section combined support finite element analysis
  • 相关文献

二级参考文献18

共引文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部