全断面富水砂层土压平衡盾构地表沉降控制 被引量:3

Surface Settlement Control of Earth Pressure Balance Shield in Whole Section Water Rich Sand Layer
下载PDF
导出
摘要 以郑州市轨道交通3号线某盾构区间为工程实例,对土压平衡盾构机掘进全断面富水砂层过程中地表沉降监测数据进行整理,并对产生地表沉降的原因进行分析总结,再根据土压平衡盾构机的特点和地层性质,提出有效沉降控制措施,研究成果可为土压平衡盾构在类似地层中的掘进提供借鉴。 Taking a shield section of Zhengzhou Rail Transit Line 3 as an example,the earth pressure balance shield machine driving whole section water rich sand layer in the process of surface subsidence monitoring data,and analyze the causes of ground surface subsidence,again according to the characteristic of earth pressure balance shield machine and the characteristics of the formation,effective settlement control measures are proposed.The research results can provide reference for the excavation of the earth pressure balance shield in similar strata.
作者 熊在森 杨晓东 贾航 韩驰 张峰 XIONG Zaisen;YANG Xiaodong;JIA Hang;HAN Chi;ZHANG Feng(North China Branch of China Construction Second Engineering Bureau Co.,Ltd.,Beijing 100071,China)
出处 《施工技术》 CAS 2020年第S01期657-660,共4页 Construction Technology
关键词 土压平衡 盾构 砂层 沉降 控制 措施 earth pressure balance shields sand layer settlement control measures
  • 相关文献

参考文献4

二级参考文献4

  • 1乐贵平,贺少辉,罗富荣,等.北京地铁盾构隧道技术[M].北京:人民交通出版社,2012:598.
  • 2杜文库,王海,闫和永.北京地铁五号线盾构试验段工程施工综述,地下铁道新技术文集[C].成都:西南交通大学出版社,2003:486-491.
  • 3杨秀权,李孝荣.土压平衡盾构在广州地铁中的应用,地下铁道新技术文集[C].成都:西南交通大学出版社,2003:434-439.
  • 4GB 50299-1999.地下铁道工程施工及验收规范[S]..1999

共引文献9

同被引文献26

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部